Skip to content
Ryan Harrison

Index/Sheet 01/Rev A0 · Draft copy

Spydr

Live

Project and task management for work that has to keep its shape.

Status
Live
Role
Engineer
Timeline
—
Stack
—

01Problem

Work tracking tools are good at collecting tasks and poor at keeping the meaning of those tasks stable. State gets edited in place. History turns into a comment thread. Two people can believe a task is in two different states, and both of them can be looking at the product.

Spydr is a project and task management application for that gap. It is live at spydr-app.cloud. The clauses on this sheet are working copy.

02Core invariant

A unit of work has one state, and that state changes only through an explicit transition.

The one-line form is the rule the rest of the system is answerable to. A task does not have a status field that anyone may patch. It has a state, and a transition is the only way that state moves.

Prior state stays addressable. If someone needs to know what was true on Tuesday, the record can say so without reconstructing it from chatter.

This wording is a draft of the invariant. Replace it with the rule the running system actually enforces.

03Contracts

  • A task belongs to one project.
  • A transition names the state it leaves and the state it enters.
  • A recorded transition is not rewritten. A correction is a new transition.
  • Repeating the same transition does not create a second copy of it.
  • Further contracts belong here once they are taken from the real schema, not invented beside it.

04Architecture

The drawing is intentionally empty. It should show the clients, the API, and the store that owns transitions, with the direction of authority marked.

Until that sheet exists, the architecture is three commitments. The interface does not invent state. The API accepts transitions rather than silent patches. The record can be replayed.

Diagram slotNot yet drawn

Fig. 01 / Architecture

05Failure modes considered

  • Two transitions accepted for the same task with no order between them.
  • A client retry that appends a second copy of a transition that already landed.
  • A status field that can still be patched directly, beside the transition log.
  • A history so noisy that the current state can no longer be read from it.

Production incidents are not listed here. If they belong on this sheet, they will be written from the record, not from memory dressed up as fact.

06Outcome

Spydr is live at spydr-app.cloud.

Usage counts, customer names, and testimonials are not on this sheet. They will be added only when they are real, and only if they help someone understand the system.

07What I'd change

Written once the system has been held long enough to know what the next revision actually is.

The empty fields above — stack, timeline, and this clause — are the ones to replace first.